WIM system and LV connection on the D8.

A WIM system with a 750 m LV connection, a 180-day trial operation and ČMI verification.

Lovosice – Sulejovice50.4780° N · 14.0850° E
KM37.300 – 48.300
Main contractorEurovia CS, a.s.
Built2019–⁠2020
01 · The briefWeigh-in-motion

A WIM system with a 750 m LV connection, a 180-day trial operation and ČMI verification.

On the eleven kilometres between Lovosice and Sulejovice, during the pavement repair (a Eurovia CS construction), we renewed the automatic traffic counter and the weather sensor, brought in a 750 m low-voltage connection for the weighbridge and supplied, installed, commissioned and integrated into the ŘSD system the complete high-⁠speed weigh-in-motion system. The work included a 180-day trial operation, verification of the WIM system by the Czech Metrology Institute and meeting all the parameters of the trial operation.

Parameters
Road
D8 motorway
Construction
Lovosice – Sulejovice, pavement repair
Chainage
km 37.300 – 48.300
Length
11 km
Main contractor
Eurovia CS, a.s.
Investor
ŘSD ČR
Built
2019–⁠2020
System
High-⁠speed weigh-in-motion (WIM)
02 · Scope of supply

What we delivered on site.

Renewal and connection

  • renewal of the automatic traffic counter and the weather sensor
  • supply of a 750 m low-voltage connection for the WIM system

High-⁠speed weigh-in-motion

supply, installation, commissioning and integration into the ŘSD system of the complete high-⁠speed weigh-in-motion system

  • provision of the 180-day trial operation
  • verification of the WIM system by the Czech Metrology Institute for instantaneous speed measurement and vehicle weighing
  • meeting the parameters of the trial operation