Reference · D8 motorway
WIM system and LV connection on the D8.
A WIM system with a 750 m LV connection, a 180-day trial operation and ČMI verification.
A WIM system with a 750 m LV connection, a 180-day trial operation and ČMI verification.
On the eleven kilometres between Lovosice and Sulejovice, during the pavement repair (a Eurovia CS construction), we renewed the automatic traffic counter and the weather sensor, brought in a 750 m low-voltage connection for the weighbridge and supplied, installed, commissioned and integrated into the ŘSD system the complete high-speed weigh-in-motion system. The work included a 180-day trial operation, verification of the WIM system by the Czech Metrology Institute and meeting all the parameters of the trial operation.
- Road
- D8 motorway
- Construction
- Lovosice – Sulejovice, pavement repair
- Chainage
- km 37.300 – 48.300
- Length
- 11 km
- Main contractor
- Eurovia CS, a.s.
- Investor
- ŘSD ČR
- Built
- 2019–2020
- System
- High-speed weigh-in-motion (WIM)
What we delivered on site.
Renewal and connection
- renewal of the automatic traffic counter and the weather sensor
- supply of a 750 m low-voltage connection for the WIM system
High-speed weigh-in-motion
supply, installation, commissioning and integration into the ŘSD system of the complete high-speed weigh-in-motion system
- provision of the 180-day trial operation
- verification of the WIM system by the Czech Metrology Institute for instantaneous speed measurement and vehicle weighing
- meeting the parameters of the trial operation
From the field.