Cable infrastructure for telematics on the D3.
Cable trench, LV lines, HDPE ducts and OK-DIS fibre blowing along the whole 10.68 km.
2 photos
D3 · Section 0309/II Ševětín – Borek · km 117.400 – 128.080 · 2017–2019
Eurovia CS · Cable infrastructure · Trench, LV lines, HDPE ducts, crossings, OK-DIS blowing
01 · The briefCable infrastructure
Cable trench, LV lines, HDPE ducts and OK-DIS fibre blowing along the whole 10.68 km.
On section 0309/II between Ševětín and Borek (a Eurovia CS construction) we provided the cable infrastructure for the future telematics along the whole 10.68 km: excavation and backfilling of the cable trench, laying of low-voltage lines and HDPE ducts, construction of transverse and longitudinal crossings and the blowing-in of the OK-DIS fibre-optic cable. All of it done so that the technology can be installed without cutting into the finished carriageway.
Parameters
- Road
- D3 motorway
- Construction
- 0309/II Ševětín – Borek
- Chainage
- km 117.400 – 128.080
- Length
- 10.68 km
- Main contractor
- Eurovia CS, a.s.
- Investor
- ŘSD ČR
- Built
- 2017–2019
- Status
- In operation
02 · Scope of supply
What we delivered on site.
Cable infrastructure
supply of the complete cable infrastructure comprising:
- excavation and backfilling of the cable trench for the installations
- laying of low-voltage lines and HDPE ducts
- construction of transverse and longitudinal crossings
- blowing-in of the OK-DIS fibre-optic cable
REF · D3 0309/II · 2017–2019