Civil works for transport telematics along the whole section: cable trench, LV lines, HDPE ducts, transverse and longitudinal crossings and fibre-optic cable blowing.
Cabling and civil works for telematics.
We deliver the complete civil works for transport telematics: excavating and backfilling the cable trench, laying LV lines and HDPE ducts, building transverse and longitudinal crossings, and blowing the OK-DIS and OK-DKS fibre-optic cables. All so that the technology can follow without touching the finished road surface.
On the D3 section 0309/II between Ševětín and Borek this meant 10.68 km, on the D1 between Přerov and Lipník 14.3 km. On the Řevničov bypass and the D4 near Skalka we followed our own civil works with the technology part as well.
An important part of our work is cooperation with leading companies on the market, for example in a joint venture with Porr a.s. on the D1 modernisation km 220.000 – 245.000 / IDS modernisation, telematics, or with SWIETELSKY stavební s.r.o. on the modernisation of the cable route and telematics connection on 50 km of the D5 motorway between Rudná and Svojkovice.
- Excavation and backfill of the cable trench
- Laying LV lines and HDPE ducts
- Transverse and longitudinal crossings
- Blowing OK-DIS and OK-DKS fibre-optic cables
- LV connections for the technology (e.g. 750 m for the WIM scale on the D8)
- Modernisation of cable routes and telematics connections
Completed projects.
D3 motorway · 2017–2019Cable infrastructure for telematics on the D3.View reference
D1 motorway · 2015–2019Telematics on 14 km of the D1 motorway.View reference
D4 motorway · 2015–2017Cabling and telematics on the D4 near Skalka.View reference
D6 motorway · 2017–2020Technology for the Řevničov bypass on the D6.View reference